Mines by stage

Exploration-stage rare earth projects in the US

Seven rare earth projects in the US are at the exploration stage: Bokan Mountain, La Paz, Diamond Creek, Sheep Creek, Silicon Ridge, Lemhi Pass and Colosseum. They are drilling or sampling without a feasibility-grade resource, and the table flags how good the evidence is for each.

Only two have a resource estimate by a qualified person, Bokan Mountain and La Paz. The others rest on company-reported sampling or historic data.

Verified through Oct 1, 2026

Exploration projects
7No feasibility-grade resource
States
6AK, MT, ID, AZ, CA and UT
With a qualified-person estimate
2Bokan Mountain and La Paz
Company-reported or historic only
5Treat grades as indications
Bokan resource grade
0.58%Heavy rare earths 35% to 40% of TREO

The definition

What counts as an exploration-stage rare earth project?

An exploration-stage rare earth project is drilling or sampling and has no feasibility-grade resource, or no rare earth resource estimate at all. Each row carries an evidence flag so a sampled grade is never read as a resource.

Exploration
Drilling or sampling; no feasibility-grade resource, or no rare earth resource estimate yet.
Tier A
A resource estimate by a qualified person under a reporting code (NI 43-101 or JORC).
Tier B
Company-reported drilling or sampling results, not independently estimated.
Tier C
Historic or government data only, or no rare earth estimate.

The comparison

Which US rare earth projects are at the exploration stage?

Seven tracked US projects are at the exploration stage. The table lists each one's state, owner, evidence quality, headline result and next step; filter by evidence tier to separate estimates from sampling results.

Evidence
7 of 7 shown
US exploration-stage rare earth projects and the quality of the evidence behind each
ProjectStateOwnerEvidence qualityHeadline resultNext step
Bokan MountainPeralkaline complex; allanite, bastnaesite, monazite, xenotime; heavy-rare-earth richAlaskaUcore Rare MetalsQualified-person estimate5.15 Mt at about 0.58% TREO, 35% to 40% heavy rare earths (Apr 2026)No mine schedule; Ucore builds a Louisiana plant first
La PazAllanite-bearing; low gradeArizonaAmerican Rare EarthsQualified-person estimate170.6 Mt at 391 ppm TREE, JORC 2012 (Aug 2021)Review for gold, silver, copper and manganese through 2026
Diamond CreekThorium-rare earth belt; yttrium-richIdahoIdaho Strategic ResourcesCompany-reported samplingAbout 1.8% TREO at surface; DC 22-8: 11.3 m at 1.5% TREO (Jul 2026)Bulk sampling and mineralogy in H2 2026
Sheep CreekCarbonatite; bastnaesite, allanite, monaziteMontanaUS Critical MaterialsCompany-reported samplingAbout 9% TREE in sampled rock; no resource estimateForest Service decision on the exploration plan estimated Jul 2027
Silicon RidgeHalloysite-hosted ion-adsorption clayUtahIonic Mineral TechnologiesCompany-reported assays and estimateHalloysite clay with rare earths; maiden estimate of 83.2 Mt indicated and 247.0 Mt inferred at an Al2O3 cut-off and a preliminary economic assessment (Jul 2026); no rare earth grade foundFurther drilling and studies; no feasibility study
Lemhi PassThorium-rare earth vein districtIdaho and MontanaIdaho Strategic ResourcesHistoric data onlyThorium and rare earth veins; historic samples up to 5% TREO; USGS thorium estimatesDrill targeting and permitting for 2026 and beyond
ColosseumGold-first project with rare earth potentialCaliforniaDateline ResourcesNo rare earth estimateGold-first project with a 1.1 Moz gold resource; rare earths are potential onlyCourt injunction since Aug 10, 2026; stay hearing Oct 26, 2026

Grades in this table use different bases: an estimate averages a defined volume of rock, while a sample result is a selected piece of it and is usually higher. Do not compare the numbers directly. See how to read a resource estimate.

Verified Oct 1, 2026 Every row links to a full profile where one exists.

How reliable are the numbers for exploration-stage rare earth projects?

Only 2 of 7 exploration projects have a resource estimate by a qualified person, so most numbers are company-reported sample results. Sample grades such as 9% at Sheep Creek or 1.8% at Diamond Creek show where rock is rich, not how much ore exists.

Bokan Mountain's April 2026 estimate rests on 97 drill holes and 85 surface channels, and La Paz's resource is a 2021 JORC estimate averaging only 391 ppm, about 0.04%. The two are at opposite ends: Bokan is small and rich, La Paz is huge and lean.

Each profile separates estimates from sampling, for example Sheep Creek and Diamond Creek.

Which exploration-stage projects are rich in heavy rare earths?

Bokan Mountain and Diamond Creek are the exploration projects with the strongest heavy rare earth evidence. Bokan's resource is 35% to 40% heavy rare earths, and Diamond Creek's surface samples average more than 2,000 ppm of heavy rare earth oxides with more than 1,300 ppm of yttrium.

Heavy rare earths such as dysprosium and terbium are the elements China licenses most tightly. Sheep Creek reports dysprosium, terbium and yttrium in its samples, but no resource backs the grades yet. US producers of dysprosium and terbium shows who could supply them.

Which exploration-stage rare earth projects face opposition or litigation?

Sheep Creek in Montana and Colosseum in California face organized opposition. Hundreds of Bitterroot residents and Ravalli County commissioners oppose Sheep Creek, and the National Parks Conservation Association sued over Colosseum, where a federal court granted a preliminary injunction on Aug 10, 2026.

Sheep Creek's revised exploration plan is under Forest Service review, with a decision estimated for July 2027. Colosseum sits in the Mojave National Preserve about 10 km north of Mountain Pass and is a gold-first project; the Interior Department approved continued development in April 2025, the court order of Aug 10, 2026 stops new drilling and road work in the Preserve while the appeal goes on, and no rare earth resource has been estimated.

What happens after the exploration stage?

An exploration project moves to development once it publishes a feasibility-grade resource and starts economic and permitting studies. Today none of the seven has done so, and the nearest steps are bulk sampling at Diamond Creek in H2 2026 and Forest Service review at Sheep Creek.

The projects in development page shows the six stages that follow, and types of US rare earth deposits explains why carbonatite, granite and clay deposits differ.

Questions about exploration-stage rare earth projects in the US

What rare earth exploration projects are there in the US?

Seven are tracked: Bokan Mountain in Alaska, Sheep Creek in Montana, Lemhi Pass and Diamond Creek in Idaho, La Paz in Arizona, Colosseum in California and Silicon Ridge in Utah.

Which US exploration project has the best heavy rare earth results?

Bokan Mountain has the strongest evidence, with a qualified-person resource that is 35% to 40% heavy rare earths. Diamond Creek reports yttrium-rich results, but those are company-reported sampling.

Is Sheep Creek a rare earth mine?

No. Sheep Creek in Montana is an exploration prospect with no resource estimate. The Forest Service is reviewing a reduced exploration plan and estimates a decision in Jul 2027.

Does Diamond Creek have a resource estimate?

No. Diamond Creek in Lemhi County, Idaho has company-reported surface and drilling results, including 11.3 m at 1.5% TREO, but no resource estimate. Bulk sampling is planned for H2 2026.

Why are exploration grades not comparable?

A resource grade averages a defined volume of rock, while a sample grade comes from selected rock and is usually higher. Bokan's 0.58% is an average and Sheep Creek's 9% is a sample result.