Mine profile

Colosseum, California: Dateline's gold and rare earth project

Exploration California

Colosseum, in San Bernardino County, California, is a former gold mine inside the Mojave National Preserve, about 10 km north of Mountain Pass, that Dateline Resources is planning to restart for gold while it drills for rare earths. No rare earth resource has been estimated, and a federal court enjoined operations in the Preserve on Aug 10, 2026.

Verified through Oct 1, 2026

Status and timeline Report a correction All US rare earth mines

Where is Colosseum?

Colosseum is on the northeast slope of the Clark Mountains in San Bernardino County, California, inside the part of the Mojave National Preserve north of Interstate 15, about 10 km north of Mountain Pass. It is reached by a National Park Service road from the interstate.

Dateline's technical report puts the site at about 14 km from the Nevada border, reached by 16.5 km of road from Interstate 15, of which the last 10.3 km is unsealed. The mine sits at 1,680 to 1,810 m above sea level in the Mojave Desert.

The name is shared with the Roman amphitheatre, so searches should include "rare earth" or "Mojave".

Who owns Colosseum?

Dateline Resources Limited, an Australian company listed on the ASX, owns 100% of Colosseum through its subsidiary Colosseum Rare Metals Inc., which operates it. Dateline bought it from Barrick Gold Corporation: the agreement was dated Feb 23, 2021 and the claims transferred on Oct 27, 2021.

The project holds 80 unpatented claims and 3 patented claims (company-reported). Most of the old mine sits on unpatented federal land, and two patented claims are in the South Pit. See Dateline Resources: what it does, projects, funding and status.

Earlier owners ran two open pits from 1988 to 1992, with milling into 1993. Dateline's report says the mine produced 344,000 oz of gold from 1989 to 1993 and closed in a low gold price, with most of the then-defined resource left in the ground.

What is the status and timeline of Colosseum?

Colosseum is in "Exploration" as a rare earth project: it has a gold feasibility study (May 2026) but no rare earth estimate, and a court order of Aug 10, 2026 stops operations in the Preserve. Dateline and the Justice Department have asked the court to stay it, with a hearing on Oct 26, 2026.

  1. 1860s to 1942

    Gold and silver are mined intermittently from a shaft at Colosseum until the War Production Board closes non-strategic mines.

  2. 1988 to 1992

    Two open pits are mined; milling continues into 1993 and the site goes into reclamation.

  3. 1994

    The California Desert Protection Act creates the Mojave National Preserve and moves the land to the National Park Service.

  4. Oct 27, 2021

    Dateline completes the purchase of the project from Barrick Gold under an agreement dated Feb 23, 2021.

  5. 2022 to 2024

    The Park Service orders Dateline to stop work and demands $213,387 for damage to Preserve land, according to the later court complaint.

  6. Jun 6, 2024

    Dateline reports a JORC gold resource of 27.1 Mt at 1.26 g/t Au for 1.1 Moz.

  7. Apr 8, 2025

    The Interior Department announces that Colosseum can continue under its existing plan of operations; Park Service letters of Apr 3 and Apr 10 recognize valid existing rights.

  8. Feb 25, 2026

    Dateline reports three carbonatite rare earth targets and a 12-hole diamond drilling program.

  9. Apr 15, 2026

    The National Parks Conservation Association sues the Interior Department in federal court over the April 2025 decision.

  10. May 11, 2026

    Dateline publishes a gold feasibility study: 573,000 oz over 10.4 years, pre-tax NPV of $785M at $4,200/oz (company-reported).

  11. Jul 3 to 6, 2026

    Dateline applies to intervene in the case; the Justice Department files its opposition on Jul 6.

  12. Aug 10, 2026

    The court grants a preliminary injunction against further grading, new drilling, habitat bulldozing and road development in the Preserve.

  13. Sept 18 to 28, 2026

    Dateline and the Justice Department move for a stay pending appeal; notices of appeal go to the Ninth Circuit on Sept 22; the Department of War files a declaration.

Next milestones

  1. Oct 26, 2026

    The court hears the motions to stay the injunction.

What is at Colosseum: gold, rare earths or both?

Colosseum is a gold deposit first: a 1.08 Moz resource and a feasibility study for a 10.4-year open pit. Rare earths are a target, not a resource: Dateline has drilled for a carbonatite like the one at Mountain Pass and reports no rare earth grade or tonnage.

The Interior Department's April 2025 announcement called Colosseum "America's second rare earth elements mine". No rare earth has been mined or estimated there, and Dateline calls the project gold-first.

The deposit is a breccia pipe, two felsite pipes in Precambrian gneiss that carry gold in fine pyrite, which is a different type from the carbonatite at Mountain Pass. Compare types of US rare earth deposits.

Colosseum figures by commodity and what each rests on
ItemFigureBasis
Gold resource44.5 Mt at 0.76 g/t Au, 1.08 Moz (17.5 Mt measured, 14.6 Mt indicated, 12.4 Mt inferred)S-K 1300 technical report, effective Apr 25, 2026; 0.2 g/t cut-off in a $4,200/oz pit shell (company-reported)
Gold reserve20.6 Mt at 0.95 g/t Au, 630 koz (14.1 Mt proved, 6.5 Mt probable)May 11, 2026 feasibility study (company-reported)
Plan2 Mtpa carbon-in-leach plant; 573,000 oz over 10.4 years; capital $249M plus $25M contingencyFeasibility study (company-reported)
Economics at $4,200/oz goldPre-tax NPV at 5%: $785M, IRR 49.5%. After tax: $551M and 38.6%Feasibility study (company-reported); these are gold-price figures, not rare earth figures
Rare earth resourceNoneExploration; no estimate by a qualified person

The gold figures are company-reported and depend on the court allowing work to resume. The older JORC estimate of June 2024 was 27.1 Mt at 1.26 g/t for 1.1 Moz, on a different basis.

What rare earth work has Dateline done at Colosseum?

Dateline has run geophysics and a diamond drilling program for a carbonatite rare earth source under Colosseum. It reports elevated rare earths in one 2025 drill hole and three targets, but no assay grade or resource, and the sources checked show no rare earth drilling results beyond that.

A hole drilled in late 2025 (RC25-038) returned elevated barium, strontium, calcium, phosphorus, thorium and uranium and anomalous rare earths at about 40 m depth, which the company calls the first drill confirmation of a carbonatite signature (company-reported).

On Feb 25, 2026 Dateline reported three carbonatite targets from gravity, magnetic, radiometric, induced polarization and magnetotelluric surveys. The main one, along the Clark Mountain Fault Zone, is about 1.2 km long and 150 to 200 m wide, and a 12-hole diamond program was approved for it, with several holes designed to pass 750 m.

By May 15, 2026 the program had grown to 18 holes, 14 planned and 4 depending on results. Five holes were finished and two were under way, with nearly 3,000 m drilled to depths of up to 745 m, and the first samples were at the laboratory. Selected core measured 2.8 to 3.1 g/cm3 in density, which the company compares with Mountain Pass carbonatites and with 2.65 g/cm3 for the gold breccia (company-reported).

Dateline says Colosseum and Mountain Pass are "genetically related". That is the company's interpretation and no independent study in the sources checked confirms it. The injunction of Aug 10 stops new drilling activity in the Preserve.

What permits and approvals does Colosseum have?

Colosseum relies on a Bureau of Land Management plan of operations approved in 1982 and amended through 1987, and on a finding by the Interior Department in April 2025 that Dateline holds valid existing rights. That position is now before a federal court.

The mine was approved under a 1985 joint environmental impact statement, and the plan expected a life of 11 to 12 years. Mining ended in 1992. In 1994 Congress created the Mojave National Preserve and moved the land to the National Park Service, which in 1995 gave a temporary approval for reclamation only.

From 2022 to 2024 the Park Service told Dateline to stop work, saying a new plan of operations was needed, and in July 2023 it demanded $213,387 for damage to Preserve land, according to the court complaint. On Apr 3 and Apr 10, 2025 the Park Service wrote that Dateline held valid existing rights and that the BLM plan remained in effect, and it withdrew the damages demand. The Interior Department announced the decision on Apr 8, 2025.

Dateline says it intends to operate within the existing plan. Its technical report says a start of site works was scheduled for Jun 5, 2026 and dry commissioning for Aug 31, 2027, a schedule written before the injunction.

Why is Colosseum in court, and what has the court ordered?

The National Parks Conservation Association sued the Interior Department on Apr 15, 2026, alleging that its April 2025 decision breaks three federal laws. On Aug 10, 2026 a federal judge granted a preliminary injunction that stops further grading, new drilling, bulldozing of sensitive habitat and road development.

The association, represented by Earthjustice, filed in the US District Court for the Central District of California (case 2:26-cv-4002). It alleges that the decision violates the Mining in the Parks Act of 1976, the California Desert Protection Act of 1994 and the National Environmental Policy Act, and says the Park Service never approved a plan of operations. It also alleges that Dateline damaged vegetation with unpermitted road work in 2022 and 2023. These are the plaintiff's allegations.

The Justice Department and Dateline dispute them. The department's opposition, filed Jul 6, 2026, argued that the existing plan of operations remains operative. Dateline and Colosseum Rare Metals applied on Jul 3 to join the case as defendants and say the Interior Department acted appropriately.

Judge Christina A. Snyder issued the injunction, which the association says stays in effect while the case continues. Dateline and Colosseum Rare Metals moved for a stay pending appeal on Sept 18, and notices of appeal to the Ninth Circuit were filed on Sept 22. The federal defendants filed their own stay motion on Sept 28, with a Department of War declaration that exploration at Colosseum serves national security. Both motions are set for hearing on Oct 26, 2026.

What government support has Colosseum received?

Colosseum has no federal grant, loan or equity in the sources checked. Its federal link is regulatory: the Interior Department's April 2025 recognition of valid existing rights, and a Department of War declaration of Sept 2026 backing a stay of the injunction.

No federal support is recorded for Colosseum in the sources checked.

A court declaration is evidence in a case, not funding. Dateline reported A$88M of cash and equivalents in May 2026 and hired an adviser on May 19 to arrange project financing for the gold project. See the government support tracker for the companies that have funding.

Questions about Colosseum

Where is the Colosseum rare earth project?

Colosseum is on the northeast slope of the Clark Mountains in the Mojave National Preserve, San Bernardino County, California, about 10 km north of the Mountain Pass mine.

Who owns Colosseum?

Dateline Resources Limited, an Australian company listed on the ASX, owns it through its subsidiary Colosseum Rare Metals Inc. It bought the project from Barrick Gold in 2021.

Is Colosseum a rare earth mine?

No. Colosseum is a former gold mine that Dateline plans to restart for gold. It is drilling for rare earths, but no rare earth resource has been estimated and nothing has been produced.

Is Colosseum approved?

The Interior Department said in April 2025 that it can continue under its 1982 plan of operations. A federal court then enjoined operations in the Preserve on Aug 10, 2026, and the stay motions are set for Oct 26, 2026.

Why did a court stop work at Colosseum?

The National Parks Conservation Association sued, alleging that the Interior decision broke federal law, and the court granted a preliminary injunction. The government and Dateline dispute the claims and are appealing.

How big is the gold resource at Colosseum?

Dateline reports 44.5 Mt at 0.76 g/t Au, or 1.08 Moz, under a US securities mining rule, and a feasibility study for 573,000 oz over 10.4 years. These are company-reported gold figures.

Sources and verification