Guide
How to read rare earth resource estimates (TREO, JORC, NI 43-101, grade)
TREO, or total rare earth oxide, is the weight of all the rare earths in rock counted as oxides, and a resource estimate multiplies tonnes of mineralized material by the TREO grade to give contained oxide. A figure such as 2,630 Mt at 3,292 ppm TREO means about 8.66 Mt of oxide in the ground, not a quantity a mine will recover.
Three systems govern how US-relevant estimates are reported: the SEC's S-K 1300, Canada's NI 43-101 and Australia's JORC Code. All sort resources into measured, indicated and inferred, and none lets a resource be called a reserve until a pre-feasibility or feasibility study shows it can pay.
Verified through Oct 1, 2026
At a glance
- Key sum
- Contained TREO = tonnage x grade
- Units
- 1% = 10,000 ppm; 1 short ton = 0.9072 tonnes
- Resource vs reserve
- A reserve needs a PFS or feasibility study; inferred resources never convert
- Worked example
- Halleck Creek
- Halleck Creek contained TREO
- 8.66 Mt2,630 Mt x 0.3292%, computed
- Equals a grade of 1%
- 10,000 ppmSo 3,292 ppm is 0.3292%
- Resource categories
- 3Measured, indicated and inferred
- Reporting standards
- 3S-K 1300, NI 43-101 and JORC
What does TREO mean, and what do the other terms in a resource estimate mean?
TREO is total rare earth oxide: the weight of all the rare earths in rock, counted as oxides. Grade is TREO as a percentage or in parts per million, tonnage is the mass of mineralized material, and contained TREO is tonnage times grade. The table defines these terms and the others you will meet in a report.
| Term | What it means | Example |
|---|---|---|
| TREO or REO | Total rare earth oxide: the lanthanides and yttrium counted as oxides. Reports differ on scandium, so check the definition. | Mountain Pass: about 5.98% TREO (OSTI). |
| TREE | Total rare earth elements: the same metals without the oxygen. The oxide of each rare earth weighs roughly 14% to 27% more than the element (calculated from atomic weights), so a TREE figure is smaller than the TREO figure for the same rock. | La Paz: 391 ppm TREE, not TREO. |
| Grade, ppm and % | The concentration of the oxide in the rock. One percent is 10,000 parts per million. | Halleck Creek: 3,292 ppm is 0.3292%. |
| Contained TREO | Tonnage times grade: the oxide held in the mineralized material, before any losses in mining and processing. | Halleck Creek: about 8.66 Mt. |
| Recoverable | The part of the contained oxide a process gets out. Flotation at Mountain Pass lifts ore from 8.55% to 61% TREO with 74.7% recovery in the SRK flowsheet that OSTI describes. | Recovery is always below 100%. |
| Cut-off grade | The grade that separates material of economic value from waste. A lower cut-off gives more tonnes at a lower average grade. | Mountain Pass reports reserves at a 2.50% TREO cut-off and resources at 2.15%; Bokan Mountain uses 0.4%. |
| LREO, MREO, HREO | Light, medium and heavy rare earth oxides. The dividing lines vary between authors, so check the report's definition. | Across seven US projects OSTI finds about 76% light, 16% medium and 8% heavy. |
| NdPr share | The part of the TREO that is neodymium and praseodymium oxide, the main magnet feed. | About 16% at Mountain Pass and about 30% at Bear Lodge (OSTI). |
| Measured, indicated, inferred | Categories of resource confidence, from conclusive to limited geological evidence. | La Paz: 35.2 Mt indicated and 135.4 Mt inferred. |
| Resource and reserve | A resource has reasonable prospects for economic extraction. A reserve is the economically mineable part of a measured or indicated resource, shown by a PFS or feasibility study. | Mountain Pass has 28.96 million short tons of proven and probable reserves. |
| Short ton and tonne | A short ton is 0.9072 metric tonnes. Most reports use tonnes (Mt, million tonnes); MP Materials reports in short tons. | 28.96 million short tons is about 26.3 Mt. |
| Ash basis | Grade quoted on the ash left after burning coal, not on the coal itself. | Brook Mine: 450 to 570 ppm on an ash basis (company-reported). |
| Qualified or competent person | The expert who signs the estimate, with at least five years of relevant experience and membership of a recognized professional body. | Required by S-K 1300, NI 43-101 and the JORC Code. |
How do I calculate contained TREO from tonnage and grade?
Multiply the tonnage by the grade as a fraction: contained TREO equals tonnes times the grade in percent divided by 100, or tonnes times ppm divided by 1,000,000. Halleck Creek's 2,630 Mt at 3,292 ppm gives about 8.66 Mt. The calculator does the same sum for six published estimates.
Worked example, Halleck Creek. The JORC resource is 2,630 Mt at 3,292 ppm TREO. First convert the grade: 3,292 ppm is 0.3292%, or 0.003292 as a fraction. Then multiply: 2,630 Mt x 0.003292 gives 8.66 Mt, which matches the about 8.7 Mt that OSTI states for the largest known US deposit by contained oxide.
That oxide is held in the rock; a mine would recover less, and the resource covers only part of the project area. The grade is also low, about 0.33%, so each tonne of oxide sits in about 304 t of rock. See how rare earths are mined for what that means for a plant.
8.66 Mt of contained TREO: 2,630 Mt at 0.3292%. About 8.7 Mt (OSTI review).
Contained oxide = tonnage x grade. One percent is 10,000 ppm. One short ton is 0.9072 metric tonnes.
| Estimate | Tonnage | Grade | Tonnage x grade | Stated in the source | Reporting basis |
|---|---|---|---|---|---|
| Halleck Creek (JORC resource) | 2,630 Mt | 0.3292% | 8.66 Mt | About 8.7 Mt (OSTI review) | JORC; ASX-listed owner |
| Mountain Pass (OSTI resource) | 33 Mt | 5.98% | 1.97 Mt | 1.9 Mt (OSTI review) | S-K 1300 report summaries, as cited by OSTI |
| Mountain Pass (proven and probable reserves, short tons) | 28.96 million short tons | 5.89% | 1.55 Mt | No contained figure stated; the filing gives 28.96 million short tons at 5.89% TREO | S-K 1300; SEC 10-K for 2025, Dec 31, 2025 |
| Bear Lodge (OSTI resource) | 16.3 Mt | 3.05% | 497 kt | No contained figure stated; computed here | OSTI review |
| Elk Creek (OSTI resource) | 360 Mt | 0.3% | 1.08 Mt | 1.04 Mt (OSTI review) | NI 43-101; grade rounded to 0.30% |
| Bokan Mountain (Ucore, Apr 2026) | 5.15 Mt | 0.58% | 29.9 kt | About 29,900 t (company-reported) | Technical report effective Apr 9, 2026; 0.4% cut-off |
The sum gives the oxide held in the mineralized material, not what a mine would recover. Small gaps against the published figure come from rounding in the tonnage or grade. Mountain Pass appears twice because a resource and a reserve are different things, and its reserve is reported in short tons.
What do measured, indicated and inferred mean?
Measured, indicated and inferred describe how sure an estimate is, from conclusive to limited geological evidence. Only measured and indicated resources can be converted to reserves, and an inferred resource may not be used to assess economic viability. The table gives the SEC's definitions and what each category allows.
| Category | Geological evidence | What it allows | US example |
|---|---|---|---|
| Measured resource | Conclusive evidence and sampling | Detailed mine planning. Can become a proven or probable reserve. | Not used in the examples here. |
| Indicated resource | Adequate evidence and sampling | Mine planning and a check of economics. Can become a probable reserve. | La Paz: 35.2 Mt. Mountain Pass: 5.29 million short tons at 3.50% TREO. |
| Inferred resource | Limited evidence and sampling | Cannot be used to assess economic viability and cannot become a reserve. | La Paz: 135.4 Mt, about 79% of its resource. Mountain Pass: 14.16 million short tons at 4.65% TREO. |
| Probable reserve | The economically mineable part of an indicated, and sometimes a measured, resource | The basis of an economically viable project, shown by a PFS or feasibility study. | Mountain Pass: 27.93 million short tons at 5.95% TREO. |
| Proven reserve | The economically mineable part of a measured resource | The highest-confidence reserve. | Mountain Pass: 1.03 million short tons at 4.22% TREO, held in stockpiles. |
Definitions are from 17 CFR 229.1300. Check whether resources include or exclude reserves: Mountain Pass reports its resources exclusive of reserves, so they are separate from its reserves. The JORC Code and CRIRSCO say reserves and resources must not be aggregated into one total, because the result misleads, and NI 43-101 requires each category to be reported separately and bars adding inferred resources to the other categories.
What is the difference between JORC, NI 43-101 and S-K 1300?
They are three national reporting rules built on the same international template. JORC is incorporated into the listing rules of the Australian and New Zealand exchanges, NI 43-101 is a Canadian securities instrument and S-K 1300 is the SEC's rule for mining companies that file in the US. All use the same resource categories and require a qualified or competent person.
| Standard | Where it applies | The expert | Study names | US examples in this directory |
|---|---|---|---|---|
| S-K 1300US Securities and Exchange Commission | Companies that file with the SEC and have material mining operations; in force for fiscal years from Jan 1, 2021, replacing Industry Guide 7. | Qualified person | Initial assessment, pre-feasibility study, feasibility study; a technical report summary | MP Materials (Mountain Pass, SRK report, Dec 31, 2025); Rare Element Resources (Bear Lodge, 2024); NioCorp (Elk Creek, 2026 exhibit). |
| NI 43-101Canadian securities regulators | Issuers listed or reporting in Canada. The CIM Definition Standards give the study terms. | Qualified person | Preliminary economic assessment, pre-feasibility study, feasibility study; a technical report | Elk Creek's 2026 feasibility study (NioCorp) and the Round Top preliminary economic assessment cited by OSTI. |
| JORC Code (2012)Joint Ore Reserves Committee | Incorporated into the listing rules of the Australian and New Zealand stock exchanges. | Competent person | Scoping study, pre-feasibility study, feasibility study | American Rare Earths: Halleck Creek and La Paz. |
All three follow the CRIRSCO international reporting template in their core definitions, although the SEC notes its rule differs from the CRIRSCO-based codes in some respects. A project listed in more than one country may report under more than one standard.
Why do two estimates for the same deposit differ?
Estimates differ because of the date, the cut-off grade, the categories included, the units and whether grade is TREO or TREE. Bokan Mountain was 5.23 Mt at about 0.65% in the OSTI review and is 5.15 Mt at about 0.58% in Ucore's Apr 2026 estimate, and Mountain Pass appears as a resource, as reserves and in short tons.
| Deposit | Figures | Why they differ |
|---|---|---|
| Bokan Mountain | 5.23 Mt at about 0.65% TREO (OSTI, from an earlier estimate); 5.15 Mt at about 0.58% (Ucore, Apr 2026, 0.4% cut-off). | Different estimate dates and cut-offs. The 2026 totals are summed from measured, indicated and inferred categories. |
| Mountain Pass | 33 Mt at 5.98% TREO (OSTI). Reserves of 28.96 million short tons at 5.89% (SEC filing, Dec 31, 2025). Further resources of 5.29 million short tons indicated and 14.16 million short tons inferred at a 2.15% cut-off. | A resource and a reserve are different things, reserves use a 2.50% cut-off, the filing reports in short tons and its resources exclude its reserves. |
| Elk Creek | 360 Mt at about 0.30% gives 1.08 Mt; OSTI states 1.04 Mt. | The grade is rounded, so the sum from the rounded figures is a little off. |
| La Paz | 391 ppm is the TREE grade; the TREO equivalent would be higher. | The estimate counts elements, not oxides, so it cannot be compared directly with a TREO grade. |
| Brook Mine | 450 to 570 ppm on an ash basis (Weir, Sept 2025, company-reported). | Grade is quoted on the ash, not on the coal, so it is higher than the grade of the coal as mined. |
When two figures differ, check the date, the category, the cut-off grade, the units and the oxide or element basis before concluding that one is wrong.
Is a higher TREO grade always better?
No. TREO counts every rare earth equally, but their values differ enormously. In MP Materials' reserve model NdPr oxide is priced at $134.49/kg and lanthanum carbonate at $1.46/kg, and NdPr is only about 16% of the concentrate, so the mix of elements matters as much as the grade.
- NdPr oxide $134.49 15.7% of the rare earth oxide in the concentrate.
- Samarium-europium-gadolinium precipitate $51.30 1.8% of the concentrate.
- Cerium chloride $6.62 Cerium is 50.2% of the concentrate.
- Lanthanum carbonate $1.46 Lanthanum is 32.3% of the concentrate.
Dollars per kilogram, as assumed for the Mountain Pass pit optimization (Dec 31, 2025)
These are modeling assumptions in an SEC filing, not market prices. Across US deposits the NdPr share of TREO ranges from about 12% at Round Top to about 32% at Bokan Mountain (OSTI), and heavy rare earths add value in deposits that have them.
Which US projects use which standard?
Each mine page gives the resource, the standard it was reported under and the sources.
- Halleck CreekThe worked example: a JORC resource of 2.63 billion tonnes
- Mountain PassResources and reserves under S-K 1300
- Bokan MountainTwo estimates that differ
- La PazA TREE grade and a mostly inferred resource
- Elk CreekAn NI 43-101 feasibility study
- Bear LodgeA second-richest US deposit
- Brook MineGrade on an ash basis
- Rare earth mines in the USEvery project and its resource
- Rare earth companies in the USThe companies behind the estimates
- How to read a rare earth projectWhat each study proves
- GlossaryEvery term used on this site
Questions about reading resource estimates
What does TREO stand for?
Total rare earth oxide: the weight of all the rare earths in rock counted as oxides. It is the standard way to state the grade of a rare earth deposit, as a percentage or in parts per million, and it usually includes yttrium.
What is the difference between TREO and TREE?
TREO counts oxides and TREE counts the elements without oxygen. Oxides weigh roughly 14% to 27% more than the elements, so a TREE grade is lower than the TREO grade of the same rock. La Paz's 391 ppm is a TREE figure.
How many ppm is 1%?
One percent is 10,000 parts per million. Halleck Creek's 3,292 ppm TREO is 0.3292%, and a grade of 5.98% TREO, as at Mountain Pass, is 59,800 ppm.
What is a good grade for a rare earth deposit?
There is no single answer. US deposits range from about 0.04% to 5.98% TREO. Value also depends on the NdPr and heavy rare earth share, the minerals, the process and the tonnage, as well as the grade.
Is a resource the same as a reserve?
No. A resource has reasonable prospects for economic extraction. A reserve is the economically mineable part of a measured or indicated resource, shown by a pre-feasibility or feasibility study. Inferred resources cannot be converted to reserves.
Which standard do US rare earth companies use?
It depends on where they report. SEC filers use S-K 1300, Canadian-listed companies use NI 43-101 and ASX-listed companies such as American Rare Earths use the JORC Code. All three share the same resource categories.
Sources and verification
The documents behind the figures on this page. Company-reported figures are labeled as such.
- eCFR: 17 CFR 229.1300, the S-K 1300 definitions for mining registrants Official record
- SEC: Modernization of Property Disclosures for Mining Registrants (Release 33-10570, Dec 2018) Official record
- JORC Code, 2012 Edition (JORC Committee) Independent press
- British Columbia Securities Commission: National Instrument 43-101, Standards of Disclosure for Mineral Projects (consolidation, Jul 25, 2023) Official record
- Canadian Securities Administrators: Staff Notice 43-307 on preliminary economic assessments (2012) Official record
- OSTI review, Minerals Engineering 249 (Kashyap et al., 2026) Research paper
- MP Materials 10-K for 2025 (SEC) Official record
- NioCorp 2026 technical report summary, exhibit 96.1 (SEC) Official record
- Stockhead: La Paz resource upgraded (Aug 2021 JORC estimate) Independent press
- Ucore: updated mineral resource estimate for Bokan Dotson-Ridge (Apr 14, 2026) Company document
Tags show what kind of source each link is. How sources are ranked
Guides
Which other guides are there?
Ten guides explain each step from mine to magnet, why the US is behind and how to read the technical reports behind each project in this directory.
- The chain Mine to magnet supply chain The five steps from ore to magnet, with every profiled US company at its step.
- The chain How rare earths are mined Open pits, underground mines, coal and mineral sands, and how ore becomes a concentrate.
- The chain How rare earths are separated Solvent extraction, RapidSX and chromatography, and the US plants that use each.
- The chain From oxide to metal and alloy Molten-salt electrolysis and metallothermic reduction, and who makes metal in the US.
- The chain How rare earth magnets are made Strip casting, pressing and sintering, and the US magnet plants with their stated capacity.
- The chain Rare earth recycling in the US Hydrogen processing, mechanical recovery and chemistry, and why volumes are still small.
- Why the US is behind Why the US cannot process rare earths Capacity against demand, and five obstacles with the evidence for each.
- Reading the reports Types of US rare earth deposits Carbonatite, granite, clay, coal and sands, with every US project mapped to a type.