Company profile
Ucore Rare Metals: the Louisiana RapidSX plant and Bokan Mountain
Processing / manufacturing (building) TSXV: UCU; OTCQX: UURAF
Ucore Rare Metals (TSXV: UCU; OTCQX: UURAF), headquartered in Halifax, Nova Scotia, is a rare earth separation-technology company building the Louisiana Strategic Metals Complex in Alexandria and holding the Bokan Mountain project in Alaska. Pat Ryan is chairman and chief executive, and the first full RapidSX machine in Louisiana is due in the first half of 2027.
Verified through Oct 1, 2026
Status and timeline Report a correction All US rare earth companies
What does Ucore Rare Metals do?
Ucore Rare Metals develops RapidSX, a faster solvent-extraction technology for separating rare earths, and is building a commercial plant for it in Alexandria, Louisiana. It works at the separation step and holds a heavy-rare-earth mine project in Alaska.
The company says RapidSX runs two to four times faster than conventional solvent extraction and uses standard equipment with a smaller footprint and lower capital cost. Its Kingston, Ontario demonstration plant, a 52-stage unit, has logged more than 5,700 operating hours and more than 25,000 samples, and has made LaCe, NdPr, SmEuGd, Sm, Gd, HoYErTmYbLu, TbDy, Tb and Dy products.
The Louisiana plant targets the middle and heavy rare earths (samarium, europium, gadolinium, terbium, dysprosium and possibly yttrium) plus NdPr oxide, which are the elements the US imports almost entirely.
Which assets and facilities does Ucore Rare Metals hold?
Ucore holds the Louisiana Strategic Metals Complex at England Airpark in Alexandria, a demonstration plant in Kingston, Ontario and 100% of the Bokan Mountain project in Alaska. The Louisiana complex is under construction and the Kingston plant is operating.
| Asset | Location | What it does | Size or output | Status |
|---|---|---|---|---|
| Louisiana Strategic Metals Complex | England Airpark, Alexandria, Louisiana | Commercial RapidSX separation of rare earth oxides | About 9,600 t/yr of TREO feed at full build: Machine A (about 600 t/yr) plus three lines of about 3,000 t/yr | Commissioning of a demonstration plant began Apr 2026; Machine A due H1 2027 |
| Commercialization and Demonstration Facility | Kingston, Ontario | 52-stage RapidSX demonstration plant | Pilot scale | Operating |
| Bokan Mountain | Prince of Wales Island, Alaska | Heavy-rare-earth-rich deposit | 5.15 Mt at about 0.58% TREO (Apr 2026) | Exploration; no schedule |
The complex's earlier staging plan, from Dec 2025, was 2,000 t/yr in 2026, 5,000 t/yr in 2027 and 7,500 t/yr in 2028. A May 2026 engineering report replaced it with a three-line design that puts the first full machine in H1 2027.
Who would buy from Ucore Rare Metals and how much could it make?
Ucore's Louisiana complex is designed to process about 9,600 t/yr of TREO feed, and Machine A alone about 600 t/yr. It received its first commercial-scale shipment of heavy rare earth concentrate on Apr 20, 2026. The sources checked name no commercial offtake customer.
The May 27, 2026 engineering report by Orbital Engineering enlarges Machine A from 64 to about 118 RapidSX stages, which lifts its capacity to about 600 t/yr, and cuts the planned production lines from four to three. Products would include NdPr, Pr, Nd, Sm, Gd, Tb, Dy and a SmEuGd mix.
Ucore says it is procuring heavy mixed rare earth oxide feedstock from US-friendly sources for commissioning and trials. Its long-term plan lists development of the Bokan mine and satellite processing centers in Canada and Alaska, though the mine is far from production.
On Aug 26, 2025 Ucore and Critical Metals signed a non-binding letter of intent for a possible offtake of rare earth product from the Tanbreez project in Greenland, as feedstock for Louisiana and, in smaller volumes at first, for Kingston. Ucore's release says a mixed rare earth carbonate or oxide would be delivered over an initial 10 years from the later of Jul 1, 2027 or commercial production; Critical Metals says up to 10,000 t of concentrate, about 10% of Tanbreez's initial projected production. Critical Metals' annual report signed Sept 25, 2026 says no binding agreement is in place.
How is Ucore Rare Metals paying for its Louisiana complex?
Ucore is paying for the Louisiana complex with a $22.4M Department of War agreement, Louisiana incentives of about $15M and private capital. The May 2026 report puts Machine A plus the first production line at $135M, so most of that capital is not yet identified as secured.
Louisiana's incentive package is valued at about $15M, including a $900,000 infrastructure grant, and the Greater Alexandria Economic Development Authority committed a $360,000 grant to ease facility costs in the first two years (company-reported).
| Item | Cost |
|---|---|
| Enhanced Machine A | $60M |
| Production Line 1 | $44M |
| Oxide production and packaging | $31M |
| Total | $135M |
The report says the estimates reflect inflation and market-cost escalation since earlier pre-engineering figures. Of the $135M, only the $18.4M Department of War funding is identified as partly funding Machine A.
What is the timeline of Ucore Rare Metals?
Ucore began a Department of War demonstration program in Dec 2023, received $18.4M more in May 2025 and started commissioning its Louisiana demonstration plant on Apr 20, 2026. Machine A, the first full RapidSX machine, is due to be installed and commissioned in H1 2027.
- 2011
Ucore reports its first resource estimate for Bokan Mountain.
- Dec 2023
The Department of War demonstration program for RapidSX begins.
- May 2025
The Department of War adds $18.4M of initial construction funding to $4M earlier, for $22.4M in total.
- Aug 26, 2025
Ucore and Critical Metals Corp sign a non-binding letter of intent for a possible 10-year supply of rare earth product from the Tanbreez project in Greenland. No binding agreement has followed in the sources checked (Sept 2026).
- Dec 2025
Ucore announces it is readying the Louisiana complex for heavy rare earth processing in 2026.
- Apr 14, 2026
Ucore upgrades the Bokan resource estimate to 5.15 Mt at about 0.58% TREO.
- Apr 20, 2026
The first commercial-scale shipment of heavy rare earth concentrate arrives in Alexandria, starting commissioning of the demonstration plant.
- May 27, 2026
An engineering report sets a three-line, 9,600 t/yr design and a $135M cost for Machine A plus the first line.
Next milestones
- H1 2027
Machine A is due to be installed, tested and commissioned.
What government support has Ucore Rare Metals received?
Ucore holds a $22.4M Other Transaction Agreement with the Department of War through the Army Contracting Command in Orlando, made up of $18.4M added in May 2025 plus $4M earlier. Louisiana adds incentives of about $15M, which are state, not federal, support.
| Agency and instrument | Amount | When | Status |
|---|---|---|---|
| Department of War (Army Contracting Command, Orlando)Other Transaction Agreement: heavy rare earth demonstration and RapidSX transition. $18.4M added May 2025 plus $4M earlier | $22.4M | Dec 2023 to May 2025 | Closed |
| State of Louisiana and GAEDEAIncentive package and local grants. State and local, not federal; company-reported | About $15M | 2025 | Closed |
The award funds RapidSX demonstration and US transition work, not the Bokan mine. See the government support tracker.
What are the risks and unknowns for Ucore Rare Metals?
The main unknowns are how Ucore will finance the $135M first phase, whether Machine A starts on schedule in H1 2027, which feedstock it will use and who will buy the oxides. This directory reports facts and gives no investment view.
- Financing: only $18.4M of the $135M first phase is identified as secured in the sources checked.
- Schedule: the staging plan changed between Dec 2025 and May 2026, and the first full machine is now H1 2027.
- Technology scale-up: RapidSX has run at pilot scale in Kingston, and commercial scale is unproven.
- Feedstock: heavy rare earth feed for Louisiana comes from outside the US, and Bokan is not near production. The Tanbreez letter of intent is non-binding and has not become an agreement.
- Offtake: no commercial customer is named in the sources checked.
Questions about Ucore Rare Metals
Is Ucore Rare Metals a public company?
Yes. Ucore trades on the TSX Venture Exchange as UCU and on the OTCQX as UURAF. This directory shows tickers as facts and gives no investment advice.
Where is Ucore Rare Metals based?
Ucore's engineering report lists its headquarters in Halifax, Nova Scotia. Its demonstration plant is in Kingston, Ontario, and its US plant is under construction in Alexandria, Louisiana.
What is RapidSX?
RapidSX is Ucore's rare earth separation technology, a faster form of solvent extraction that the company says runs two to four times quicker than conventional circuits with a smaller footprint.
When will Ucore start producing rare earth oxides in Louisiana?
Ucore began commissioning a demonstration plant on Apr 20, 2026 and expects Machine A, its first full RapidSX machine, to be installed, tested and commissioned in the first half of 2027.
How much will the Ucore Louisiana plant cost?
A May 2026 engineering report estimates $135M for Machine A and the first 3,000 t/yr production line, including $31M for oxide production and packaging. Only $18.4M of Department of War funding is identified as partly funding Machine A.
Does Ucore own a mine?
Yes, the Bokan Mountain heavy-rare-earth project in Alaska, which is at the exploration stage with a 5.15 Mt resource. The company says its near-term US focus is Louisiana processing and not the mine.
Sources and verification
The documents behind the figures on this page. Company-reported figures are labeled as such.
- OSTI review, Minerals Engineering 249 (Kashyap et al., 2026) Research paper
- Ucore: engineering report for the Louisiana Strategic Metals Complex (May 2026) Company document
- Ucore: non-binding letter of intent with Critical Metals Corp for Tanbreez feedstock (Aug 26, 2025) Company document
- Critical Metals Corp: annual report on Form 20-F for the year to Jun 30, 2026 (SEC, signed Sept 25, 2026) Official record
- Ucore: readies for Louisiana 2026 heavy rare earth processing (Dec 2025) Company document
- Ucore: updated Bokan mineral resource estimate (Apr 2026) Company document
- Engineering News: Ucore estimates higher cost for the Louisiana plant (May 2026) Independent press
- Metal Tech News: DoD funds Ucore (Jun 2025) Independent press
- Mining Weekly: Louisiana Strategic Metals Complex (Aug 2026) Independent press
Tags show what kind of source each link is. How sources are ranked