Company profile
Vulcan Elements: NdFeB magnets and the planned Benson campus
Processing / manufacturing (operating) Private HQ: Research Triangle Park, North Carolina
Vulcan Elements, a private company based in Research Triangle Park, North Carolina, makes sintered NdFeB magnets and plans a 10,000 t/yr magnet campus in Benson, North Carolina. It was founded in 2023, operates a small plant making about 10 t/yr of magnets, and has a conditional $620M loan commitment from the Office of Strategic Capital (Nov 2025).
Verified through Oct 1, 2026
Status and timeline Report a correction All US rare earth companies
What does Vulcan Elements do?
Vulcan Elements makes sintered neodymium-iron-boron (NdFeB) magnets and plans to add rare earth metal making. It opened a 21,000 sq ft facility in Research Triangle Park on Mar 31, 2025 and is building toward a large plant in Benson, North Carolina.
The company works at the metal and magnet steps. Its Research Triangle Park plant had about 10 t/yr of capacity in Oct 2025 and 30 employees at opening. In Nov 2025 it described a $1.4B partnership with ReElement Technologies, which would supply separated oxides, backed by Department of War financing.
Axios reported on Sept 23, 2026 that Vulcan is supplying magnets for an Army drone program. This directory could not read the full report, so it lists no volumes or contract terms.
Which assets and facilities does Vulcan Elements operate?
Vulcan Elements operates one plant, in Research Triangle Park, and plans the Benson campus in Johnston County, North Carolina. The $918.1M Benson project would cover about one million square feet and employ about 1,000 people.
| Asset | Location | What it does | Size or output | Status |
|---|---|---|---|---|
| Research Triangle Park plant | Research Triangle Park, North Carolina | Sintered NdFeB magnets | About 10 t/yr (Oct 2025); 21,000 sq ft; 30 employees at opening | Operating since Mar 31, 2025 |
| Benson campus | Benson, Johnston County, North Carolina | Magnets and metal; "largest magnet factory outside China" (company) | 10,000 t/yr target; $918.1M; one million sq ft; about 1,000 jobs | Planned; factory launch expected after summer 2026 workforce training; significant output by 2027 (company) |
The North Carolina Department of Commerce announced the Benson project on Nov 18, 2025, with a Job Development Investment Grant of up to $17.58M over 12 years and a $3.6M Golden LEAF grant to Johnston Community College for training.
Who buys from Vulcan Elements and how much can it make?
Vulcan Elements can make about 10 t/yr of magnets today and targets 10,000 t/yr at Benson. Its named supply partners are ReElement Technologies, Ucore Rare Metals, Energy Fuels and Consarc, and its named customers are Pentagon contracts and orders.
- ReElement Technologies: separated rare earth oxides from Indiana, announced with Vulcan in Nov 2025.
- Ucore Rare Metals: a memorandum of understanding for NdPr and dysprosium oxides from Louisiana, with commercial deliveries from 2027.
- Energy Fuels: listed as a materials source.
- Consarc: furnace equipment from New Jersey.
Who owns Vulcan Elements and who runs it?
Vulcan Elements is private. John Maslin, a former US Navy officer, is chief executive and Piotr Kulik is chief technology officer. Altimeter Capital, One Investment Management and 1789 Capital invested in a $65M Series A in Aug 2025.
Data aggregators list later funding rounds and valuations, but their figures conflict, so this directory does not report them. 1789 Capital is a venture firm tied to Donald Trump Jr., which is the subject of the scrutiny described below.
Other named executives include Jake Bowles (chief operating officer) and Scott Glover (chief commercial officer), per Wikipedia.
What is the timeline of Vulcan Elements?
Vulcan Elements was founded in 2023, opened its first plant on Mar 31, 2025, raised a Series A in Aug 2025 and announced the Pentagon loan and Benson plant in Nov 2025. Its next milestones are Benson output and Ucore deliveries, both targeted for 2027.
- 2023
John Maslin and Piotr Kulik found Vulcan Elements in Boston.
- Mar 31, 2025
The Research Triangle Park plant opens (21,000 sq ft, 30 employees).
- Aug 2025
Vulcan raises a $65M Series A led by Altimeter Capital, One Investment Management and 1789 Capital.
- Nov 2025
The Department of War announces a $620M conditional Office of Strategic Capital loan commitment, and North Carolina announces the $918.1M Benson project and 1,000 jobs; a $1.4B partnership with ReElement is described.
- May 2026
ProPublica reports on the White House role in the loan request.
- Jun to Jul 2026
An ethics group writes to the Defense Department inspector general, and a senator writes to the Defense Department about the loan.
- Sept 23, 2026
Axios reports that Vulcan is supplying magnets for an Army drone program.
Next milestones
- After summer 2026
Benson workforce training is due to start before the factory launch.
- 2027
Significant Benson output and the first Ucore oxide deliveries are targeted.
What government support has Vulcan Elements received?
Vulcan Elements has a conditional $620M loan commitment from the Department of War's Office of Strategic Capital, a non-binding $50M letter of intent from the Department of Commerce for an equity investment, and North Carolina incentives of up to $17.58M. The federal items were announced in Nov 2025.
| Agency and instrument | Amount | When | Status |
|---|---|---|---|
| Office of Strategic Capital (Department of War)Conditional loan commitment. With $550M of private capital for a project of about $1B | $620M | Nov 2025 | Conditional |
| Department of CommerceCHIPS incentive for equipment, with $50M of equity to Commerce. Preliminary letter of intent; not a final award | $50M | Nov 3, 2025 | Non-binding |
| State of North Carolina (Job Development Investment Grant)Grant over 12 years. Depends on job and investment targets; state, not federal | Up to $17.58M | Nov 2025 | Conditional |
| Golden LEAF FoundationGrant to Johnston Community College for training. Non-profit and state, not federal | $3.6M | 2025 | Closed |
The sources reviewed do not confirm that the loan has closed, and the Commerce letter is preliminary. The state grant is conditional on meeting job and investment targets. See the government support tracker.
What are the risks and unknowns for Vulcan Elements?
The main unknowns are building Benson, securing oxide feedstock from suppliers that are themselves ramping, and political scrutiny of the loan. Current output is about 10 t/yr against a 10,000 t/yr target. This directory reports facts and gives no investment view.
- Scale-up: Benson is planned, with workforce training starting after summer 2026 and significant output targeted for 2027 (company statements).
- Feedstock: its oxide suppliers, ReElement and Ucore, are still building plants, and Ucore deliveries start in 2027.
- Scrutiny of the loan: ProPublica reported in May 2026 that a White House adviser, Peter Navarro, initiated the request for the $620M loan, and that a venture firm tied to Donald Trump Jr. had taken an undisclosed stake about three months earlier. Defense officials and the company downplayed suspicions of cronyism. A senator wrote to the Defense Department in Jul 2026 and an ethics group wrote to its inspector general in Jun 2026.
- Private company: little financial reporting is public, so many figures are company statements.
Questions about Vulcan Elements
Is Vulcan Elements a public company?
No. Vulcan Elements is private. It plans a magnet campus of about $1B in Benson, North Carolina, backed by a conditional $620M Office of Strategic Capital loan commitment and $550M of private capital, announced in Nov 2025.
Who owns Vulcan Elements?
Vulcan Elements is privately held. John Maslin, its CEO, and Piotr Kulik founded it in 2023, and investors in its Aug 2025 Series A included Altimeter Capital, One Investment Management and 1789 Capital.
Where is Vulcan Elements located?
Vulcan Elements is based in Research Triangle Park, North Carolina, where its first plant opened on Mar 31, 2025. Its planned large plant is in Benson, in Johnston County.
How many magnets does Vulcan Elements make?
About 10 t/yr as of Oct 2025 at its Research Triangle Park plant. It targets 10,000 t/yr at Benson, with a significant share online by 2027, according to company statements.
Why is the Vulcan Elements loan controversial?
ProPublica reported in May 2026 that White House adviser Peter Navarro initiated the $620M loan request about three months after a venture firm tied to Donald Trump Jr. took an undisclosed stake. Officials and the company downplayed suspicions of cronyism.
Sources and verification
The documents behind the figures on this page. Company-reported figures are labeled as such.
- Department of War: Office of Strategic Capital joint $700M conditional loan commitment with Vulcan Elements and ReElement (Nov 2025) Official record
- Commerce CHIPS Program Office: preliminary letter of intent for Vulcan Elements (Nov 3, 2025) Official record
- Vulcan Elements and ReElement announce a $1.4B partnership (PR Newswire, Nov 2025) Company document
- North Carolina Commerce: Vulcan Elements selects Johnston County (Nov 2025) Official record
- Manufacturing Dive on the Benson plant Independent press
- Mining Weekly on the Benson plant (Nov 2025) Independent press
- WUNC: the White House intervened to get a $620 million deal (May 2026) Independent press
- NC Newsline on the ProPublica report (May 2026) Independent press
- Metal Powder: Vulcan and Ucore supply memorandum Independent press
- Senator Schiff letter to the Defense Department on the Vulcan loan (Jul 2026) Official record
- CREW letter to the Defense Department inspector general (Jun 2026) Independent press
- Axios: Vulcan supplying magnets for Army drone push (Sept 2026) Independent press
Tags show what kind of source each link is. How sources are ranked