Mine profile
Brook Mine, Wyoming: Ramaco's coal-hosted rare earth project
Development Wyoming
Brook Mine, near Ranchester in Sheridan County, Wyoming, is a coal deposit that Ramaco Resources (Nasdaq: METC) is developing for rare earths and other critical minerals. It has not produced coal or rare earths commercially, and a Jul 2026 study targets first production in 2031.
Verified through Oct 1, 2026
Status and timeline Report a correction All US rare earth mines
Where is Brook Mine?
Brook Mine is near Ranchester in Sheridan County, northern Wyoming, on about 15,800 acres of surface and mineral rights that Ramaco controls. Ramaco bought the property in 2011 from Pittston Coal for $2M.
The site sits in the Tongue River Valley, close to the Montana border, and Ramaco keeps operational offices in Sheridan. The deposit was first permitted as a coal mine, and the rare earths occur in the coal ore itself, so the same pit would yield both.
Brook Mine is one of three Wyoming rare earth projects in this directory. Halleck Creek lies in the Laramie Mountains and Bear Lodge in the Black Hills.
Who owns Brook Mine?
Ramaco Resources (Nasdaq: METC) owns Brook Mine. Ramaco is headquartered in Lexington, Kentucky, and Randall Atkins is its chairman and chief executive. Ramaco Carbon, LLC, a Ramaco subsidiary, joined it in its trade-secrets suit.
Ramaco's main business is metallurgical coal from Central Appalachia, with mines in West Virginia and Virginia. Brook Mine is its only property outside that region. The name of Ramaco's West Virginia complex, Elk Creek, is unrelated to NioCorp's Elk Creek project in Nebraska.
Ramaco raised about $200M in a public stock offering in Aug 2025 and reported liquidity of $400.1M at Jun 30, 2026. See Ramaco Resources: what it does, projects, funding and status.
What is the status and timeline of Brook Mine?
Brook Mine is in "Development": it has an initial resource estimate and a conceptual study, but no reserves and no commercial output. Ramaco reports the property as under third-party testing, and its Jul 2026 study targets first production in 2031.
- 2011
Ramaco acquires the Brook property from Pittston Coal for $2M.
- 2014
Ramaco files its first coal permit application with Wyoming.
- Aug 2017
The Environmental Quality Council rejects the coal permit in a 4-1 vote.
- 2019
A court rules the council lacked the authority to reject the permit and returns the case to the Department of Environmental Quality.
- Jul 2020
The Department of Environmental Quality approves the coal permit with 12 conditions.
- May 2023
Ramaco announces rare earths in the coal ore after 18 months of core drilling across 4,500 acres, using an AI model from the National Energy Technology Laboratory.
- Jul 2025
Groundbreaking on Jul 11 with Energy Secretary Chris Wright and Gov. Mark Gordon; Fluor delivers its preliminary economic assessment on Jul 8.
- Aug 2025
Ramaco raises about $200M in a public stock offering.
- Sept 2025
Weir International releases an initial mineral resource estimate.
- Oct 2025
Ramaco announces a Strategic Critical Minerals Terminal for stockpiling and processing.
- Jan 2026
A shareholder class action is filed in New York over Brook Mine disclosures.
- Mar 16, 2026
Ramaco sues a former critical minerals director for alleged trade-secret theft.
- Jul 29, 2026
Ramaco releases the Hatch conceptual study: NPV of $8B, capital of $3.2B plus contingency, initial production in 2031.
Next milestones
- Fall 2026
The pilot plant building is due to be completed.
- End of 2026
An interim revised economics study is expected.
- 2027
A pre-feasibility study and full-scale pilot operations are expected.
- 2031
Initial production is targeted (Hatch conceptual study).
What rare earths does Brook Mine hold?
Brook Mine is a coal-hosted unconventional deposit with neodymium, praseodymium, dysprosium and terbium, plus gallium, scandium and germanium. A Weir estimate puts the high case at about 1.7 Mt TREO, at 450 to 570 ppm on an ash basis (company-reported).
Weir International prepared the initial resource estimate in Sept 2025. It reports a maximum grade by rock type of about 3,300 to 9,600 ppm. The grades are measured on ash, so they are not comparable with the ore grades of hard-rock deposits such as Mountain Pass. The estimate is not a mineral reserve.
Ramaco says the deposit is the largest unconventional rare earth deposit found in the US. That is a company statement, and the coverage reviewed does not mention independent verification. The company says about 75% of expected revenue would come from critical minerals used in semiconductors.
| Study | Date | Production plan | Economics |
|---|---|---|---|
| Fluor preliminary economic assessment | Jul 2025 | About 5 Mt/yr of coal ore giving roughly 3,400 t/yr of oxides; commercial output targeted for the second half of 2028 | Judged technically and economically viable (company statement) |
| Hatch conceptual study | Jul 29, 2026 | Initial production in 2031 from a carbochlorination refinery | NPV of $8B and average adjusted EBITDA of $1.3B a year; capital of $3.2B plus about $0.8B contingency (Ramaco modeling) |
The 2025 figures come from earlier company statements and the 2026 figures from Ramaco's Aug 4, 2026 earnings release. A pre-feasibility study is expected in 2027.
How would Brook Mine be processed and who would buy the output?
Ramaco plans a carbochlorination refinery to turn Brook Mine coal ore into oxides and other critical minerals. A pilot plant in Wyoming is under construction, with full operations expected in 2027, and no offtake agreement has been finalized.
The Hatch study validated carbochlorination as the preferred route. The pilot building is due to be finished in the fall of 2026, with equipment being fabricated at a Zeton facility in Canada, and Ramaco says it is well financed through all stages up to refinery construction.
Ramaco says it is in advanced discussions on offtake and on non-dilutive project financing from public or private sources. It has also announced a Strategic Critical Minerals Terminal for stockpiling and processing, designed by Fluor, and is exploring blending e-waste and PVC into the feedstock.
Since the Jul 2025 groundbreaking Ramaco has mined enough coal ore to supply pilot testing and, at intervals, small volumes for sale to utilities. Its 2025 annual report states that Brook Mine has not begun commercial coal production or shipment.
What permits, community and legal issues affect Brook Mine?
Wyoming approved Brook Mine's coal permit in Jul 2020 with 12 conditions and renewed it in 2025, and it covers about one-third of the acreage. Ramaco also faces a securities class action over its Brook Mine disclosures and has sued a former executive over trade secrets.
- Permit history: Ramaco applied in 2014. The Environmental Quality Council rejected the permit 4-1 in Aug 2017, a court ruled in 2019 that the council lacked that authority, and the Department of Environmental Quality approved it in Jul 2020 with an estimate of 17.3 Mt of thermal coal over about 40 years. The Powder River Basin Resource Council appealed and has said it will keep monitoring the permit.
- Securities class action: A shareholder suit filed in Jan 2026 in the Southern District of New York alleges that Ramaco and two executives made misleading statements about progress at Brook Mine, including that no active work was taking place after the Jul 2025 opening. It followed a Wolfpack Research report. Ramaco says it has meritorious defenses. These are allegations, and no ruling was found in the sources checked.
- Trade-secrets suit: On Mar 16, 2026 Ramaco sued Alex Moyes, its former director of critical minerals, in federal court in Wyoming. It alleges he emailed more than 40 sensitive documents to a personal account before joining USA Rare Earth as a vice president. The coverage reviewed does not report the outcome of Ramaco's request for a restraining order.
What government support has Brook Mine received?
Brook Mine has received a $6.1M Wyoming state grant for its processing plant and no federal funding in the sources checked. Ramaco says it is pursuing non-dilutive financing for the refinery, which may involve public or private sources.
| Agency and instrument | Amount | When | Status |
|---|---|---|---|
| State of WyomingGrant for the processing plant. State, not federal, funding | $6.1M | 2025 | Closed |
Federal programs that fund coal-waste rare earth work, such as the Department of Energy's Jul 2026 pilot awards, did not include Ramaco. See the government support tracker.
Questions about Brook Mine
Is Brook Mine producing rare earths?
No. Brook Mine has not produced rare earths or commercial coal. Ramaco is building a pilot plant, with full operations expected in 2027, and its Jul 2026 conceptual study targets first production in 2031.
Is Brook Mine the first new US rare earth mine in 70 years?
Officials described it that way at the Jul 2025 groundbreaking. This directory labels it "Development" because it has no commercial output, no reserves and no finalized offtake or project financing yet.
Who owns Brook Mine?
Ramaco Resources (Nasdaq: METC), a metallurgical coal producer based in Lexington, Kentucky, owns Brook Mine. It bought the property in 2011 from Pittston Coal for $2M.
How much rare earth is at Brook Mine?
Weir International's initial estimate gives a high case of about 1.7 Mt of TREO at 450 to 570 ppm on an ash basis. Ramaco commissioned the estimate, and the coverage reviewed does not mention independent verification.
What is the lawsuit about Brook Mine?
A shareholder class action filed in Jan 2026 alleges that Ramaco misled investors about progress at Brook Mine after its Jul 2025 opening. Ramaco says it has meritorious defenses, and the case was still pending in the sources checked.
When will Brook Mine start producing?
Ramaco's Jul 2026 Hatch study targets initial production in 2031. An earlier 2025 plan targeted the second half of 2028, so the timetable has moved back by about three years.
Sources and verification
The documents behind the figures on this page. Company-reported figures are labeled as such.
- Ramaco 10-K for 2025 (SEC) Official record
- Ramaco Q2 2026 earnings release (SEC) Official record
- Wikipedia: Brook Mine (history and permit chronology) Reference work
- WyoFile on the shareholder lawsuit (Apr 2026) Independent press
- Cowboy State Daily on the trade-secrets suit (Mar 2026) Independent press
- Wyoming Public Media on the coal permit Independent press
- KSAT on the Jul 2025 groundbreaking Independent press
Tags show what kind of source each link is. How sources are ranked