{
 "source": "Rare Earth Directory",
 "url": "https://rareearthdirectory.com",
 "verified": "2026-10-01",
 "license": "Free to use with attribution to the Rare Earth Directory",
 "rows": [
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "MP Materials",
   "site": "Mountain Pass separations plant",
   "where": "San Bernardino County, California",
   "step": "Separated oxide",
   "stage": "Operating",
   "product_and_figure_as_stated": "NdPr oxide: 2,599 t in 2025; 917 t in Q1 and 840 t in Q2 2026",
   "note": "MP says the plant ran below design capacity in 2025 and expects full design capacity in Q1 2027.",
   "capacity_tracker_row": "mp-mountain-pass",
   "source_1": "https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mp-20251231.htm",
   "source_2": "https://mpmaterials.com/news/mp-materials-reports-second-quarter-2026-results"
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "Energy Fuels",
   "site": "White Mesa Mill, Phase 1 circuit",
   "where": "Blanding, Utah",
   "step": "Separated oxide",
   "stage": "Operating",
   "product_and_figure_as_stated": "NdPr oxide: 850 to 1,000 t/yr stated; its 2024 commissioning run turned 500 t of monazite into 38 t of NdPr product (company-reported)",
   "note": "The circuit shares equipment with uranium milling, so rare earth and uranium runs alternate.",
   "capacity_tracker_row": "ef-white-mesa-p1",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001385849/000138584926000029/efr-20260630.htm",
   "source_2": "https://www.sec.gov/Archives/edgar/data/1385849/000138584925000004/efr-20241231.htm"
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "MP Materials",
   "site": "Independence",
   "where": "Fort Worth, Texas",
   "step": "Metal or alloy",
   "stage": "Operating",
   "product_and_figure_as_stated": "NdPr metal since Jan 2025; output not published",
   "note": "Metal and alloy capacity is not stated apart from the magnet capacity.",
   "capacity_tracker_row": "mp-independence-metal",
   "source_1": "https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mp-20251231.htm",
   "source_2": ""
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "Phoenix Tailings",
   "site": "Exeter metal refinery",
   "where": "Exeter, New Hampshire",
   "step": "Metal or alloy",
   "stage": "Operating",
   "product_and_figure_as_stated": "Metal: 200 t/yr built of 500 t/yr (company-reported); reportedly NdPr metal",
   "note": "Output and customers are not published.",
   "capacity_tracker_row": "phoenix-exeter-built",
   "source_1": "https://fortune.com/2026/08/03/phoenix-tailings-rare-earth-refinery-new-hampshire-pentagon/",
   "source_2": "https://www.globenewswire.com/news-release/2026/06/16/3312801/0/en/u-s-department-of-war-helps-launch-an-1b-initiative-with-phoenix-tailings-to-rebuild-america-s-rare-earth-industrial-base.html"
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "USA Rare Earth",
   "site": "Stillwater",
   "where": "Stillwater, Oklahoma",
   "step": "Metal or alloy",
   "stage": "Operating",
   "product_and_figure_as_stated": "Strip-cast alloy for its own NdFeB magnets; capacity not stated separately",
   "note": "Part of the Stillwater magnet figure.",
   "capacity_tracker_row": "usar-stillwater-metal",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001970622/000197062226000056/exhibit991-earningsrelease.htm",
   "source_2": ""
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "Ucore Rare Metals",
   "site": "Louisiana Strategic Metals Complex",
   "where": "Alexandria, Louisiana",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "About 9,600 t/yr of rare earth feed at full build (not NdPr); Machine A about 600 t/yr",
   "note": "A demonstration plant began commissioning in Apr 2026; products include NdPr, Pr, Nd, Sm, Gd, Tb, Dy and a SmEuGd mix. No commercial offtake customer is named in the sources checked.",
   "capacity_tracker_row": "ucore-louisiana",
   "source_1": "https://www.newsfilecorp.com/release/299208/Ucore-Engineering-Report-Drives-Optimized-Commercial-Deployment-Plan-for-Louisiana-Strategic-Metals-Complex",
   "source_2": ""
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "ReElement Technologies",
   "site": "Marion advanced technology center",
   "where": "Marion, Indiana",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Over 16,000 t/yr of products across four lines (releases give different targets)",
   "note": "Products include NdPr, dysprosium, terbium, gadolinium and yttrium oxides. No output is published.",
   "capacity_tracker_row": "reelement-marion",
   "source_1": "https://www.sec.gov/Archives/edgar/data/1590715/000165495425012526/arec_ex991.htm",
   "source_2": "https://www.war.gov/News/Releases/Release/Article/4541423/department-of-war-announces-25-million-investment-with-reelement-technologies-t/"
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "Aclara Resources",
   "site": "Port of Vinton separation facility",
   "where": "Vinton, Louisiana",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "Dy, Tb and NdPr oxides; capacity not stated",
   "note": "A $277M plant to separate mixed carbonate from Brazil and Chile; completion targeted for the end of 2027.",
   "capacity_tracker_row": "aclara-vinton",
   "source_1": "https://www.opportunitylouisiana.gov/news/aclara-invests-277-million-to-build-nations-first-heavy-rare-earth-separation-facility-in-southwest-louisiana",
   "source_2": ""
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "Energy Fuels",
   "site": "White Mesa Mill, Phase 2 circuit",
   "where": "Blanding, Utah",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "About 5,000 t/yr of NdPr oxide more (over 6,000 t/yr for the whole mill)",
   "note": "Not under construction: expected by mid-2029, subject to licensing, financing, feed and a final investment decision. Capital is about $410M.",
   "capacity_tracker_row": "ef-white-mesa-p2",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001385849/000138584926000029/efr-20260630.htm",
   "source_2": "https://www.osti.gov/pages/servlets/purl/3438652"
  },
  {
   "element_group": "NdPr (neodymium and praseodymium)",
   "company": "NioCorp",
   "site": "Elk Creek (rare earth products)",
   "where": "Johnson County, Nebraska",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "About 650 t/yr of NdPr oxide on average over 40 years (a plan, not a capacity)",
   "note": "Rare earths are a secondary stream next to niobium and scandium.",
   "capacity_tracker_row": "niocorp-elk-creek",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001512228/000119312526402806/nb-20260630.htm",
   "source_2": ""
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "Energy Fuels",
   "site": "White Mesa Mill",
   "where": "Blanding, Utah",
   "step": "Separated oxide",
   "stage": "Pilot or demonstration",
   "product_and_figure_as_stated": "Dysprosium and terbium oxide at about 99.9% purity at pilot scale; first kilogram of terbium oxide in Mar 2026 (company-reported)",
   "note": "The company calls it the first US primary production of these China-licensed elements in decades.",
   "capacity_tracker_row": "",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001385849/000138584926000029/efr-20260630.htm",
   "source_2": "https://www.cruxinvestor.com/posts/energy-fuels-white-mesa-mill-produces-first-us-terbium-oxide-in-decades-targets-commercial-heavy-rare-earth-output-by-2027"
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "USA Rare Earth",
   "site": "Wheat Ridge demonstration facility",
   "where": "Wheat Ridge, Colorado",
   "step": "Separated oxide",
   "stage": "Pilot or demonstration",
   "product_and_figure_as_stated": "Dysprosium and NdPr oxide samples from Round Top material, Jul 2026",
   "note": "A run of at least 2,000 continuous hours is expected to finish in Oct 2026.",
   "capacity_tracker_row": "",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001970622/000197062226000056/exhibit991-earningsrelease.htm",
   "source_2": ""
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "Phoenix Tailings",
   "site": "Exeter metal refinery",
   "where": "Exeter, New Hampshire",
   "step": "Metal or alloy",
   "stage": "Operating",
   "product_and_figure_as_stated": "Reportedly a dysprosium-iron alloy; quantity not published",
   "note": "The same plant as the NdPr metal row; capacity is for all metal and alloy.",
   "capacity_tracker_row": "phoenix-exeter-built",
   "source_1": "https://fortune.com/2026/08/03/phoenix-tailings-rare-earth-refinery-new-hampshire-pentagon/",
   "source_2": "https://www.globenewswire.com/news-release/2026/06/16/3312801/0/en/u-s-department-of-war-helps-launch-an-1b-initiative-with-phoenix-tailings-to-rebuild-america-s-rare-earth-industrial-base.html"
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "MP Materials",
   "site": "Mountain Pass heavy rare earth circuit",
   "where": "San Bernardino County, California",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Dysprosium and terbium output expected later in 2026; no tonnage given",
   "note": "The first circuit was mechanically complete in May 2026. Mountain Pass ore carries 0.0% dysprosium and terbium (OSTI), and the sources checked do not name the circuit's feed.",
   "capacity_tracker_row": "mp-heavy",
   "source_1": "https://mpmaterials.com/news/mp-materials-reports-second-quarter-2026-results",
   "source_2": "https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mp-20251231.htm"
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "Energy Fuels",
   "site": "White Mesa Mill, heavy rare earth expansion",
   "where": "Blanding, Utah",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Up to about 120 t/yr dysprosium oxide and 20 t/yr terbium oxide, by the end of 2027",
   "note": "Construction began on Jul 29, 2026 for about $104M; commissioning as early as Q4 2027.",
   "capacity_tracker_row": "ef-wm-heavy-dy",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001385849/000138584926000029/efr-20260630.htm",
   "source_2": ""
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "ReElement Technologies",
   "site": "Marion advanced technology center",
   "where": "Marion, Indiana",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Dysprosium and terbium oxides among its products; no separate figure",
   "note": "Chromatographic separation; targets differ between releases.",
   "capacity_tracker_row": "reelement-marion",
   "source_1": "https://www.sec.gov/Archives/edgar/data/1590715/000165495425012526/arec_ex991.htm",
   "source_2": "https://www.war.gov/News/Releases/Release/Article/4541423/department-of-war-announces-25-million-investment-with-reelement-technologies-t/"
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "Ucore Rare Metals",
   "site": "Louisiana Strategic Metals Complex",
   "where": "Alexandria, Louisiana",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Terbium and dysprosium among the planned products; no separate figure",
   "note": "The Kingston, Ontario demonstration plant has made Tb, Dy and TbDy products.",
   "capacity_tracker_row": "ucore-louisiana",
   "source_1": "https://www.newsfilecorp.com/release/299208/Ucore-Engineering-Report-Drives-Optimized-Commercial-Deployment-Plan-for-Louisiana-Strategic-Metals-Complex",
   "source_2": ""
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "Aclara Resources",
   "site": "Port of Vinton separation facility",
   "where": "Vinton, Louisiana",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "High-purity dysprosium and terbium oxides; capacity not stated",
   "note": "Aclara says the output could supply more than 75% of US needs for those elements in electric vehicles (company statement). Feed from Brazil and Chile is expected from about mid-2028.",
   "capacity_tracker_row": "aclara-vinton",
   "source_1": "https://www.opportunitylouisiana.gov/news/aclara-invests-277-million-to-build-nations-first-heavy-rare-earth-separation-facility-in-southwest-louisiana",
   "source_2": ""
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "Energy Fuels",
   "site": "White Mesa Mill, Phase 2 circuit",
   "where": "Blanding, Utah",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "About 168 t/yr more dysprosium oxide and 60 t/yr more terbium oxide (about 288 t and 80 t for both circuits)",
   "note": "By mid-2029, subject to licensing, financing, feed and a final investment decision. The January 2026 study gave 240 t and 66 t for Phase 2 alone.",
   "capacity_tracker_row": "ef-wm-p2-dy",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001385849/000138584926000029/efr-20260630.htm",
   "source_2": ""
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "NioCorp",
   "site": "Elk Creek (rare earth products)",
   "where": "Johnson County, Nebraska",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "About 66 t/yr of dysprosium oxide and 17 t/yr of terbium oxide on average over 40 years (a plan, not a capacity)",
   "note": "No date is published for rare earth output; the construction target is Dec 2026, subject to financing.",
   "capacity_tracker_row": "niocorp-heavy",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001512228/000119312526402806/nb-20260630.htm",
   "source_2": ""
  },
  {
   "element_group": "Dysprosium and terbium",
   "company": "Lynas USA",
   "site": "Seadrift heavy rare earth separation plant (planned)",
   "where": "Seadrift, Texas",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "Heavy rare earth separation; capacity and date not stated",
   "note": "Lynas has said significant uncertainty exists over whether the plant will be built. In Mar 2026 it signed a binding letter of intent with the Department of War for about $96M of light and heavy oxide purchases over four years (company-reported).",
   "capacity_tracker_row": "lynas-seadrift",
   "source_1": "https://www.miningweekly.com/article/lynas-flags-uncertainty-over-texas-rare-earths-plant-posts-profit-slump-2025-08-28",
   "source_2": ""
  },
  {
   "element_group": "Samarium",
   "company": "Arnold Magnetic Technologies",
   "site": "Rochester headquarters",
   "where": "Rochester, New York",
   "step": "Magnet",
   "stage": "Operating",
   "product_and_figure_as_stated": "Samarium cobalt magnets; capacity not stated",
   "note": "Arnold sources samarium outside China, with 2025 supply agreements with Less Common Metals and Solvay. A newer Thailand plant is meant to more than double its SmCo output.",
   "capacity_tracker_row": "",
   "source_1": "https://www.arnoldmagnetics.com/blog/arnold-magnetic-technologies-leads-industry-with-strategic-investments-and-agreements-to-ensure-continuity-of-critical-rare-earth-materials-supply/",
   "source_2": "https://www.arnoldmagnetics.com/blog/arnold-magnetic-technologies-announces-strategic-expansion-for-thailand-operations/"
  },
  {
   "element_group": "Samarium",
   "company": "Electron Energy Corporation",
   "site": "Landisville",
   "where": "Landisville, Pennsylvania",
   "step": "Magnet",
   "stage": "Operating",
   "product_and_figure_as_stated": "Samarium cobalt and NdFeB magnets; no capacity figure",
   "note": "Not profiled here; the detail comes from the company's own materials.",
   "capacity_tracker_row": "",
   "source_1": "https://manufacturing-today.com/news/electron-energy-corporation/",
   "source_2": ""
  },
  {
   "element_group": "Samarium",
   "company": "MP Materials",
   "site": "Mountain Pass and the 10X campus",
   "where": "California and Texas",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "First samarium production planned in 2028 (company target)",
   "note": "A $150M Department of Defense loan, issued Aug 2025, extends heavy rare earth refining to samarium oxide separation.",
   "capacity_tracker_row": "",
   "source_1": "https://mpmaterials.com/news/mp-materials-reports-second-quarter-2026-results",
   "source_2": "https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mp-20251231.htm"
  },
  {
   "element_group": "Samarium",
   "company": "Energy Fuels",
   "site": "White Mesa Mill, heavy rare earth expansion",
   "where": "Blanding, Utah",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Up to about 140 t/yr of samarium oxide, due by the end of 2028 depending on market needs",
   "note": "The samarium, europium and gadolinium circuits follow the dysprosium and terbium circuits.",
   "capacity_tracker_row": "",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001385849/000138584926000029/efr-20260630.htm",
   "source_2": ""
  },
  {
   "element_group": "Samarium",
   "company": "Ucore Rare Metals",
   "site": "Louisiana Strategic Metals Complex",
   "where": "Alexandria, Louisiana",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Samarium and a SmEuGd mix among the planned products; no separate figure",
   "note": "The demonstration plant in Kingston, Ontario has made Sm and SmEuGd products.",
   "capacity_tracker_row": "ucore-louisiana",
   "source_1": "https://www.newsfilecorp.com/release/299208/Ucore-Engineering-Report-Drives-Optimized-Commercial-Deployment-Plan-for-Louisiana-Strategic-Metals-Complex",
   "source_2": ""
  },
  {
   "element_group": "Yttrium and scandium",
   "company": "Chemours",
   "site": "Heavy-mineral-sand operations",
   "where": "Florida",
   "step": "Ore or concentrate",
   "stage": "Operating",
   "product_and_figure_as_stated": "Monazite concentrates that contain yttrium-rich xenotime; no yttrium figure",
   "note": "The USGS says no fully commercial facility in the US could separate or refine yttrium in 2025.",
   "capacity_tracker_row": "",
   "source_1": "https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-yttrium.pdf",
   "source_2": ""
  },
  {
   "element_group": "Yttrium and scandium",
   "company": "ReElement Technologies",
   "site": "Marion advanced technology center",
   "where": "Marion, Indiana",
   "step": "Separated oxide",
   "stage": "Building",
   "product_and_figure_as_stated": "Yttrium oxide among its products; no separate figure",
   "note": "No output is published.",
   "capacity_tracker_row": "reelement-marion",
   "source_1": "https://www.sec.gov/Archives/edgar/data/1590715/000165495425012526/arec_ex991.htm",
   "source_2": "https://www.war.gov/News/Releases/Release/Article/4541423/department-of-war-announces-25-million-investment-with-reelement-technologies-t/"
  },
  {
   "element_group": "Yttrium and scandium",
   "company": "USA Rare Earth",
   "site": "Round Top",
   "where": "Hudspeth County, Texas",
   "step": "Ore or concentrate",
   "stage": "Planned",
   "product_and_figure_as_stated": "About 72% of the oxide is heavy rare earths plus yttrium (company-reported); first production targeted for H2 2028",
   "note": "The feasibility study is expected in Q4 2026.",
   "capacity_tracker_row": "",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001970622/000197062226000056/exhibit991-earningsrelease.htm",
   "source_2": "https://www.osti.gov/pages/servlets/purl/3438652"
  },
  {
   "element_group": "Yttrium and scandium",
   "company": "NioCorp",
   "site": "Elk Creek",
   "where": "Johnson County, Nebraska",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "Scandium oxide: about 115 t/yr on average over 40 years; 12 t/yr contracted (company-reported)",
   "note": "Subject to financing. The USGS says scandium capacity is under development at Elk Creek, and NioCorp received a $10M Department of War grant in 2025.",
   "capacity_tracker_row": "",
   "source_1": "https://www.sec.gov/Archives/edgar/data/0001512228/000119312526402806/nb-20260630.htm",
   "source_2": "https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-scandium.pdf"
  },
  {
   "element_group": "Yttrium and scandium",
   "company": "Small refiners, named only by place by the USGS",
   "site": "Small-scale scandium metal refining",
   "where": "Ames, Iowa and Tolleson, Arizona",
   "step": "Metal or alloy",
   "stage": "Operating",
   "product_and_figure_as_stated": "Small-scale scandium metal refining capacity; no figure",
   "note": "The USGS says scandium was not commercially mined or recovered in the US in 2025, and lists more capacity under development in Urbana, Illinois and at Elk Creek.",
   "capacity_tracker_row": "",
   "source_1": "https://pubs.usgs.gov/periodicals/mcs2026/mcs2026-scandium.pdf",
   "source_2": ""
  },
  {
   "element_group": "Yttrium and scandium",
   "company": "ElementUSA",
   "site": "Gramercy bauxite residue project",
   "where": "Gramercy, Louisiana",
   "step": "Separated oxide",
   "stage": "Planned",
   "product_and_figure_as_stated": "A scandium and gallium demonstration plant; no capacity stated",
   "note": "A $29.9M Department of War award of Nov 2025 for the demonstration plant is on the government support tracker.",
   "capacity_tracker_row": "",
   "source_1": "https://www.engineeringnews.co.za/article/colorado-school-of-mines-elementusa-awarded-us-gov-funding-to-recover-rare-earths-from-alumina-tailings-2026-06-03",
   "source_2": ""
  },
  {
   "element_group": "Cerium and lanthanum",
   "company": "MP Materials",
   "site": "Mountain Pass flotation concentrate",
   "where": "San Bernardino County, California",
   "step": "Ore or concentrate",
   "stage": "Operating",
   "product_and_figure_as_stated": "Concentrate is 32.3% lanthanum and 50.2% cerium by oxide, with 15.7% NdPr (MP reserve model)",
   "note": "Before 2025, concentrate that MP did not separate itself was sold, mostly through a distributor to refiners in China; MP stopped all sales to China in Jul 2025 (company).",
   "capacity_tracker_row": "",
   "source_1": "https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mp-20251231.htm",
   "source_2": ""
  },
  {
   "element_group": "Cerium and lanthanum",
   "company": "MP Materials",
   "site": "Mountain Pass separations plant",
   "where": "San Bernardino County, California",
   "step": "Separated oxide",
   "stage": "Operating",
   "product_and_figure_as_stated": "Lanthanum carbonate and cerium chloride; no tonnage given",
   "note": "Lanthanum and cerium are 82.7% of the Mountain Pass oxide (OSTI), so they are the largest part of the ore and the by-products of NdPr.",
   "capacity_tracker_row": "",
   "source_1": "https://www.osti.gov/pages/servlets/purl/3438652",
   "source_2": "https://www.sec.gov/Archives/edgar/data/1801368/000180136826000008/mp-20251231.htm"
  }
 ]
}